The contractor hires framing lumber for a 2,400 sq.ft. house; however, 8% less lumber has been received. Two days of crew idle time and rush shipping costs. All drawings were good. Only the count was wrong. The Expert Material & Takeoff Quantity Estimating Services can save all that since it is based on the fact that it converts drawings into correct quantities before any ordering takes place. Numbers are critical to any bid, schedule, and ordering, and just a few percentages of error in count can kill the whole job’s profitability.

Why Small Count Errors Get Expensive

Takeoff errors rarely seem apparent. All the errors mentioned above seem to be rather minor problems. These could include missing wall takeoffs, schedules of doors that do not exist on the drawings, or slab thickness taken from a different page. In the case of the 50,000 sq. ft. warehouse building, for instance, ½” extra slab thickness equates to an estimated 77 yards of concrete material worth more than $11,000.

The rest of the error comes from revisions in the drawings. The revision notice or addendum was received two days prior to bid day; the architect has made changes to the shear wall, but the old quantity still exists in the spreadsheet. Revision clouds and addendum numbers assist bidders in not bidding on a structure that has changed.

What Material Takeoff Services Actually Deliver

Material Takeoff Services begin with the complete plan set and follow with the division of work by trade and CSI division. Concrete is sold by the cubic yard, drywall is sold by the sheet, conduit is sold by linear feet and roofing is sold by the square. A waste factor is associated with each line. Typically 5 to 10 percent is required for framing lumber, 8 percent for sheet goods and 10 to 15 percent for tile layout on a diagonal.

It’s not just about the number: the format is important, too! The usable takeoff lists item descriptions, quantities, units and sheet references, allowing the estimator to query any number and track it back to the drawing. Color-marked plans indicate precisely what was counted. Omissions in the drawings should be represented as questions in written form, no assumptions.

How Quantity Takeoff Services Handle Different Trades

Every discipline has different features when it comes to Quantity Takeoff Services. Sitework is based on the difference in volumes between existing and proposed contours, and the length of pipe between structures. Structural steel is counted by member, with weights taken off of AISC tables, e.g., a W12x26 member with 26 pounds per foot. Electrical counts devices, fixtures and wire runs by circuit.

Software speeds up the measuring. Are you looking for a way to save time as an estimator by clicking through a plan and getting areas and lengths estimated immediately? An estimator looking to save time by clicking through a plan and getting areas and lengths calculated instantly will find a solution in Bluebeam, PlanSwift, and On-Screen Takeoff. None of them read the specifications, however. There must be someone out there who has caught that Section 07 21 00 specifies R-21 batts and the plans call for R-13.

Construction Material Takeoff Services for Real Projects

Construction Material Takeoff Services vary from project to project. A Residential Builder requires Lumber Packages, Trusses, Sheathing and Window Counts per room. In addition to the above, a commercial general contractor requires metal studs, fire rated assemblies and ceiling grid. Demolition quantities are easily undercounted because existing conditions are often under-drawn and are added to the quantities of the renovation work.

Timing matters too. Takeoff by delivery phase allows a superintendent to place a rebar footing order during week one and trusses for the roof in week six. Switchgear, elevators, curtain wall and other long-lead products require flagging prior to the contract’s execution, as it may take 20-40 weeks to arrive.

Turning Quantities Into a Price

Labor and Material Cost Estimation turns counts into dollars. The prices of materials should be obtained from the most recent quotes from suppliers, as lumber can change 20 percent in just one quarter. Production rates include labor productivity, which might be a drywall crew hanging and finishing 600 square feet a day. The loaded labor rates range anywhere from 25 to 40 percent above base wages due to payroll taxes, insurance and benefits.

The overheads and profit are added at the end. Dumpsters, temporary power, small tools and equipment are not spread throughout the trades, but are held in general conditions. A new draw that has a contingency of 3-5% is appropriate. An upheaval with concealed situations could possibly require 10.

Choosing the Right Provider

Get some estimates before hiring anyone. Quality take-off and estimating services that are worth your money include organized sheets, traceable counts and a list of excluded items. Check trade experience as well. A provider that excels at the residential framing side of the business may not be as successful on mechanical piping or structural steel. Check that the output will open in the estimator’s system, be it Excel, Sage or Pro Est.

It is followed by the terms of turnaround and revision. A single-family take-off will be back in 24 to 48 hours and a mid-size commercial package in 3 to 5 days. Any Addenda must be included in the original price. A provider that bills repeatedly after each bulletin that the architect issues is overcharging the bid.

Final Thoughts

The most effective practice of this work comes after the project closes. Check quantity takeoff vs. quantity purchased and change waste factors accordingly. A contractor who has 8 percent drywall waste in the textbook and 12 percent in their contractor’s history solves the problem by not depending on guesswork, but on facts.